Shelly aquired a really nice shaped 82 ATC 110 and decided to do a full out restoration.Shelly's 110 is all OEM.
Here is a virtual walk through of restoring an ATC
She started by completely tearing it down to nothing. Then came sandblasting and painting everything was then re-assembled.
Here are some pictures of what she started with. Notice Shelly's SWEET!! riding boots!!!
MOST PARTS ARE FINISHED (03/05/06)
A most Productive weekend (04/09/06)
Things are working out very well for Shelly's OEM restore. Should be showroom condition in no time. All she has to do is finish re-assembling it and get the new tires. She ordered Sheng Shin 22X11X8 Knobbies (OEM look-a-likes) on Saturday morning, so they should be in and ready to mount late this week. If all goes well, we'll be "Rolling" by the coming weekend.
OH - Shelly just remembered, she needs to paint her exhaust!!!!
Things are coming together now!!! 4-15/16-06
Re-assembly has gone well, as expected. This machine is rolling. Shelly's just needs some detail cleaning/polishing on the engine and the engine put back in and she has herself a NEW 1982 ATC110 - OEM (or as close as it gets here at Tionesta Trikes). We're down to the end of this project now. I am tickled with the way is has turned out. Enjoy these pictures, as there will only be one more set, and those shall be finished pictures of this Awesome OEM Restore.
| 02-04-06 | 1 hour | remove tires and wheels - hang from rafters - remove seat, fenders and tank - remove air box - remove brake drum cover and axle nuts - remove front axle - remove all 3 hubs - toolbox |
| 02-05-06 | 3 hours | sandblast and paint: toolbox - airbox - brake drum cover - front axle and hubs |
| 02-08-06 | 2 hours | rear brake drum and rear axle removal |
| 02-18-06 | 1 hour | removed headlight - rear skid plate - foot pegs - and exhaust/muffler |
| 02-19-06 | 6 hours | removed axle carrier - chain plates - carb - electrical system - front clip (bars, bearings) - grab bar and tail light -rear brake mechanism and cables. Sandblasted and primed some parts listed. |
| 03-04-06 | 6 hours | Primed and painted all sanblasted parts |
| 04-07-06 | 0.5 hours | Removed Engine from frame - removed remaining electrical system |
| 04-08-06 | 5 hours | Sandblasted Frame and motor mounts - cleaned engine (degreased - pressure washed) - painted frame |
| 04-09-06 | 1 hour | Begin re-assembly |
| 04-15/16-06 | 6 hour | Re-assembly |
| 12 weeks | 31.5 hours | Labor of Love |